Ahmed W A Hammad

Senior Lecturer
Book Chapters
add
Hammad AWA; Haddad A, 2021, 'Infrastructure Resilience: Assessment, Challenges and Insights', in Industry, Innovation and Infrastructure, Springer International Publishing, pp. 1 - 13, http://dx.doi.org/10.1007/978-3-319-71059-4_25-1
2021
Silva AB; Najjar MK; Hammad AWA; Haddad A; Vazquez E, 2021, 'Comparative Study of Consumption and Life-Cycle Impacts of Water Heating Systems for Residential Multi-familiar Buildings in Rio de Janeiro, Brazil', in Building Pathology and Rehabilitation, Springer International Publishing, pp. 137 - 154, http://dx.doi.org/10.1007/978-3-030-55893-2_7
2021
Hammad AWA; Haddad A, 2021, 'Infrastructure Resilience: Assessment, Challenges, and Insights', in Industry, Innovation and Infrastructure, Springer International Publishing, pp. 620 - 631, http://dx.doi.org/10.1007/978-3-319-95873-6_25
2021
Hammad AWA; Sutrisna M; Zaman A, 2019, 'Towards optimising OSM implementation in construction projects', in Offsite Production and Manufacturing for Innovative Construction, Routledge, pp. 189 - 222, http://dx.doi.org/10.1201/9781315147321-9
2019
Figueiredo K; Hammad A; Haddad A, 2019, 'Sustainable Construction Achieved Through Life Cycle Assessment: Methodology, Limitations and the Way Forward', in Encyclopedia of Renewable and Sustainable Materials, pp. 576 - 583, http://dx.doi.org/10.1016/B978-0-12-803581-8.11360-8
2019
Hammad A; Akbar Nezhad A; Rey D, 2018, 'Accounting for Embodied Carbon Emissions in Planning and Optimisation of Transport Operations During Construction', in Pomponi F; De Wolf C; Moncaster A (ed.), Embodied Carbon in Buildings : Measurement, Management, and Mitigation, Springer, pp. 301 - 321, http://dx.doi.org/10.1007/978-3-319-72796-7_14
2018
Hammad A; Akbar Nezhad A; Rey D, 2017, 'Estimation of Input Parameters Used in Site Layout Planning Through Integration of BIM and Project Schedules', in Peng W; Haijiang L; Xiangyu W (ed.), Integrated Building Information Modelling, Bentham Science Publishers (ebooks), Sharjah UAE, pp. 121 - 157, http://dx.doi.org/10.2174/9781681084572117010008
2017
Hammad A; Akbar Nezhad A; Rey D, 2016, 'Accounting for Noise Pollution in Planning of Smart Cities', in Smart Cities as a Solution for Reducing Urban Waste and Pollution, IGI Global, pp. 149 - 196, http://dx.doi.org/10.4018/978-1-5225-0302-6.ch006
2016
Journal articles
add
Figueiredo K; Pierott R; Hammad AWA; Haddad A, 2021, 'Sustainable material choice for construction projects: A Life Cycle Sustainability Assessment framework based on BIM and Fuzzy-AHP', Building and Environment, vol. 196, pp. 107805 - 107805, http://dx.doi.org/10.1016/j.buildenv.2021.107805
2021
Najjar MK; Rosa AC; Hammad AWA; Vazquez E; Jorge Evangelista AC; Tam VWY; Haddad A, 2021, 'A regression-based framework to examine thermal loads of buildings', Journal of Cleaner Production, vol. 292, http://dx.doi.org/10.1016/j.jclepro.2021.126021
2021
Loosemore M; Alkilani SZ; Hammad AWA, 2021, 'Barriers to employment for refugees seeking work in the Australian construction industry: an exploratory study', Engineering, Construction and Architectural Management, vol. ahead-of-print, http://dx.doi.org/10.1108/ECAM-08-2020-0664
2021
de Souza IT; Rosa AC; Vidal MCR; Najjar MK; Hammad AWA; Haddad AN, 2021, 'Information technologies in complex socio-technical systems based on functional variability: A case study on hvac maintenance work orders', Applied Sciences (Switzerland), vol. 11, pp. 1 - 20, http://dx.doi.org/10.3390/app11031049
2021
Rosa AC; de Souza IT; Terra A; Hammad AW; Di Gregório LT; Vazquez E; Haddad A, 2021, 'Quantitative risk analysis applied to refrigeration's industry using computational modeling', Results in Engineering, vol. 9, http://dx.doi.org/10.1016/j.rineng.2021.100202
2021
Kasznar APP; Hammad AWA; Najjar M; Qualharini EL; Figueiredo K; Pereira Soares CA; Haddad AN, 2021, 'Multiple dimensions of smart cities’ infrastructure: A review', Buildings, vol. 11, pp. 1 - 27, http://dx.doi.org/10.3390/buildings11020073
2021
Hong Y; Hammad AWA; Akbarnezhad A; Arashpour M, 2020, 'A neural network approach to predicting the net costs associated with BIM adoption', Automation in Construction, vol. 119, http://dx.doi.org/10.1016/j.autcon.2020.103306
2020
Rosa A; Hammad AWA; Qualharini E; Vazquez E; Haddad A, 2020, 'Smoldering fire propagation in corn grain: an experimental study', Results in Engineering, vol. 7, http://dx.doi.org/10.1016/j.rineng.2020.100151
2020
de Siqueira ACH; Najjar MK; Hammad AWA; Haddad A; Vazquez E, 2020, 'Sustainable urban development in Slum areas in the city of Rio de Janeiro based on LEED-ND indicators', Buildings, vol. 10, http://dx.doi.org/10.3390/BUILDINGS10070116
2020
Chen Z; Hammad AWA; Kamardeen I; Akbarnezhad A, 2020, 'Optimising embodied energy and thermal performance of thermal insulation in building envelopes via an automated building information modelling (BIM) tool', Buildings, vol. 10, pp. 1 - 23, http://dx.doi.org/10.3390/buildings10120218
2020
da Silva M; Najjar MK; Hammad AWA; Haddad A; Vazquez E, 2020, 'Assessing the retention capacity of an experimental green roof prototype', Water (Switzerland), vol. 12, http://dx.doi.org/10.3390/w12010090
2020
Hammad AWA, 2020, 'A multi-objective construction site layout planning problem solved through integration of location and traffic assignment models', Construction Management and Economics, vol. 38, pp. 756 - 772, http://dx.doi.org/10.1080/01446193.2019.1659510
2020
Molinaro R; Najjar MK; Hammad AWA; Haddad A; Vazquez E, 2020, 'Urban Development Index (UDI): A comparison between the city of Rio de Janeiro and four other global cities', Sustainability (Switzerland), vol. 12, http://dx.doi.org/10.3390/su12030823
2020
Polanco-Guzmán I; Rodríguez-Troncoso M; Hammad AWA; Haddad AN; Tam VWY; Vasco DA, 2020, 'An improved ventilation system for settling stage of a wastewater treatment plant: a computational simulation analysis', International Journal of Construction Management, pp. 1 - 20, http://dx.doi.org/10.1080/15623599.2020.1857003
2020
Martins SS; Evangelista ACJ; Hammad AWA; Tam VWY; Haddad A, 2020, 'Evaluation of 4D BIM tools applicability in construction planning efficiency', International Journal of Construction Management, http://dx.doi.org/10.1080/15623599.2020.1837718
2020
Lima EG; Chinelli CK; Guedes ALA; Vazquez EG; Hammad AWA; Haddad AN; Soares CAP, 2020, 'Smart and sustainable cities: The main guidelines of city statute for increasing the intelligence of Brazilian cities', Sustainability (Switzerland), vol. 12, http://dx.doi.org/10.3390/su12031025
2020
Hammad AW; Grzybowska H; Sutrisna M; Akbarnezhad A; Haddad A, 2020, 'A novel mathematical optimisation model for the scheduling of activities in modular construction factories', Construction Management and Economics, vol. 38, pp. 534 - 551, http://dx.doi.org/10.1080/01446193.2019.1682174
2020
Chen Z; Hammad AWA; Kamardeen I; Haddad A, 2020, 'Optimising window design on residential building facades by considering heat transfer and natural lighting in nontropical regions of Australia', Buildings, vol. 10, pp. 1 - 27, http://dx.doi.org/10.3390/buildings10110206
2020
Hong Y; Hammad A; Zhong X; Wang B; Akbarnezhad A, 2020, 'Comparative Modeling Approach to Capture the Differences in BIM Adoption Decision-Making Process in Australia and China', Journal of Construction Engineering and Management, vol. 146, http://dx.doi.org/10.1061/(ASCE)CO.1943-7862.0001746
2020
Hammad AWA; Rey D; Bu-Qammaz A; Grzybowska H; Akbarnezhad A, 2020, 'Mathematical optimization in enhancing the sustainability of aircraft trajectory: A review', International Journal of Sustainable Transportation, vol. 14, pp. 413 - 436, http://dx.doi.org/10.1080/15568318.2019.1570403
2020
Froufe MM; Chinelli CK; Guedes ALA; Haddad AN; Hammad AWA; Soares CAP, 2020, 'Smart buildings: Systems and drivers', Buildings, vol. 10, http://dx.doi.org/10.3390/buildings10090153
2020
Perlingeiro RM; Perlingeiro MSPL; Chinelli CK; Vazquez EG; Qualharini EL; Haddad AN; Hammad AWA; Soares CAP, 2020, 'Sustainable assessment of public works through a multi-criteria framework', Sustainability (Switzerland), vol. 12, http://dx.doi.org/10.3390/SU12176896
2020
Najjar MK; Tam VWY; Di Gregorio LT; Evangelista ACJ; Hammad AWA; Haddad A, 2019, 'Integrating parametric analysis with building information modeling to improve energy performance of construction projects', Energies, vol. 12, http://dx.doi.org/10.3390/en12081515
2019
Hammad AW; Akbarnezhad A; Wu P; Wang X; Haddad A, 2019, 'Building information modelling-based framework to contrast conventional and modular construction methods through selected sustainability factors', Journal of Cleaner Production, vol. 228, pp. 1264 - 1281, http://dx.doi.org/10.1016/j.jclepro.2019.04.150
2019
Hammad AWA, 2019, 'A Bilevel Multiobjective Optimisation Approach for Solving the Evacuation Location Assignment Problem', Advances in Civil Engineering, vol. 2019, http://dx.doi.org/10.1155/2019/6052931
2019
Hammad AWA, 2019, 'Minimising the deviation between predicted and actual building performance via use of neural networks and BIM', Buildings, vol. 9, http://dx.doi.org/10.3390/buildings9050131
2019
Najjar MK; Figueiredo K; Hammad AWA; Tam VWY; Evangelista ACJ; Haddad A, 2019, 'A framework to estimate heat energy loss in building operation', Journal of Cleaner Production, vol. 235, pp. 789 - 800, http://dx.doi.org/10.1016/j.jclepro.2019.07.026
2019
Najjar MK; Figueiredo K; Evangelista ACJ; Hammad AWA; Tam VWY; Haddad A, 2019, 'Life cycle assessment methodology integrated with BIM as a decision-making tool at early-stages of building design', International Journal of Construction Management, pp. 1 - 15, http://dx.doi.org/10.1080/15623599.2019.1637098
2019
Hong Y; Hammad AWA; Akbarnezhad A, 2019, 'Forecasting the net costs to organisations of building information modelling (BIM) implementation at different levels of development (LOD)', Journal of Information Technology in Construction, vol. 24, pp. 588 - 603, http://dx.doi.org/10.36680/J.ITCON.2019.033
2019
Najjar MK; Qualharini EL; Hammad AWA; Boer D; Haddad A, 2019, 'Framework for a systematic parametric analysis to maximize energy output of PV modules using an experimental design', Sustainability (Switzerland), vol. 11, http://dx.doi.org/10.3390/su11102992
2019
Hammad AWA; Akbarnezhad A; Haddad A; Vazquez EG, 2019, 'Sustainable zoning, land-use allocation and facility location optimisation in smart cities', Energies, vol. 12, http://dx.doi.org/10.3390/en12071318
2019
Hong Y; Hammad AWA; Akbarnezhad A, 2019, 'Impact of organization size and project type on BIM adoption in the Chinese construction market', Construction Management and Economics, vol. 37, pp. 675 - 691, http://dx.doi.org/10.1080/01446193.2019.1575515
2019
Najjar M; Figueiredo K; Hammad AWA; Haddad A, 2019, 'Integrated optimization with building information modeling and life cycle assessment for generating energy efficient buildings', Applied Energy, vol. 250, pp. 1366 - 1382, http://dx.doi.org/10.1016/j.apenergy.2019.05.101
2019
Hammad A; Nezhad AA; Grzybowska H; Wu P; Wang X, 2018, 'Mathematical Optimisation of Location and Design of Windows by Considering Energy Performance, Installation Cost and Privacy of Buildings', Smart and Sustainable Built Environment. Special Issue: Sustainable Planning, Urban Design & Architecture in the Middle East & North Africa region, http://dx.doi.org/10.1108/SASBE-11-2017-0070
2018
Hammad A; Akbarnezhad A; Grzybowska H; We P; Wang X, 2018, 'Mathematical Optimisation of Location and Design of Windows by Considering Energy Performance, Lighting and Privacy of Buildings', Smart and Sustainable Built Environment. Special Issue: Sustainable Planning, Urban Design & Architecture in the Middle East & North Africa region 04 Apr 2018, http://dx.doi.org/10.1108/SASBE-11-2017-0070
2018
Moussavi Nadoushani ZS; Hammad AWA; Akbarnezhad A, 2018, 'Closure to "location Optimization of Tower Crane and Allocation of Material Supply Points in a Construction Site Considering Operating and Rental Costs" by Zahra Sadat Moussavi Nadoushani, Ahmed W. A. Hammad, and Ali Akbarnezhad', Journal of Construction Engineering and Management, vol. 144, http://dx.doi.org/10.1061/(ASCE)CO.1943-7862.0001558
2018
Moussavi Nadoushani ZS; Hammad AWA; Xiao J; Akbarnezhad A, 2018, 'Minimizing cutting wastes of reinforcing steel bars through optimizing lap splicing within reinforced concrete elements', Construction and Building Materials, vol. 185, pp. 600 - 608, http://dx.doi.org/10.1016/j.conbuildmat.2018.07.023
2018
Hammad A; Akbarnezhad A; Oldfield PF, 2018, 'Optimising Embodied Carbon and U-value in Load Bearing Walls: A Mathematical Bi-Objective Mixed Integer Programming Approach', Energy and Buildings, vol. 174, pp. 657 - 671, http://dx.doi.org/10.1016/j.enbuild.2018.05.061
2018
Hammad AWA; Akbarnezhad A, 2018, 'Sustainable lighting layout in urban areas: Maximizing implicit coverage and minimizing installation cost', Frontiers in Built Environment, vol. 4, http://dx.doi.org/10.3389/fbuil.2018.00042
2018
Hong Y; Hammad A; Sepasgozar S; Akbar Nezhad A, 2017, 'BIM Adoption Model for Small and Medium Construction Organisations in Australia', Engineering, Construction and Architectural Management, vol. accepted for publication, in press, http://dx.doi.org/10.1108/ECAM-04-2017-0064
2017
Hammad AWA; Akbarnezhad A; Rey D, 2017, 'Sustainable urban facility location: Minimising noise pollution and network congestion', Transportation Research Part E: Logistics and Transportation Review, vol. 107, pp. 38 - 59, http://dx.doi.org/10.1016/j.tre.2017.09.005
2017
Hammad AWA; Akbarnezhad A; Rey D, 2017, 'Bilevel Mixed-Integer Linear Programming Model for Solving the Single Airport Location Problem', Journal of Computing in Civil Engineering, vol. 31, http://dx.doi.org/10.1061/(ASCE)CP.1943-5487.0000697
2017
Hammad AWA; Rey D; Akbarnezhad A, 2017, 'A cutting plane algorithm for the site layout planning problem with travel barriers', Computers and Operations Research, vol. 82, pp. 36 - 51, http://dx.doi.org/10.1016/j.cor.2017.01.005
2017
Moussavi Nadoushani ZS; Hammad A; Akbar Nezhad A, 2016, 'Location Optimization of Tower Crane and Allocation of Material Supply Points in a Construction Site Considering Operating and Rental Costs', Journal of Construction Engineering and Management, vol. 143, http://dx.doi.org/10.1061/(ASCE)CO.1943-7862.0001215
2016
Hammad AW; Akbarnezhad A; Rey D, 2015, 'A multi-objective mixed integer nonlinear programming model for construction site layout planning to minimise noise pollution and transport costs', Automation in Construction, vol. 61, pp. 73 - 85, http://dx.doi.org/10.1016/j.autcon.2015.10.010
2015
Hammad AW; Akbarnezhad A; Rey D; Waller ST, 2015, 'A Computational Method for Estimating Travel Frequencies in Site Layout Planning', Journal of Construction Engineering and Management, vol. 142, http://dx.doi.org/10.1061/(ASCE)CO.1943-7862.0001086
2015
Sá TSW; Najjar MK; Hammad AWA; Vazquez EG; Haddad AN, 'Assessing Rainwater Quality Treated via a Green Roof System', , http://dx.doi.org/10.21203/rs.3.rs-354504/v1
Conference Papers
add
Loosemore M; Hammad A; Alkilani SZ, 2020, 'Refugee experiences of finding decent work in the Australian construction industry', in ARCOM 2020 - Association of Researchers in Construction Management, 36th Annual Conference 2020 - Proceedings, pp. 65 - 74
2020
Munawar HS; Hammad AWA; Ullah F; Ali TH, 2019, 'After the Flood: A Novel Application of Image Processing and Machine Learning for Post-Flood Disaster Management', in 2nd International Conference on Sustainable Development in Civil Engineering (ICSDC 2019), Jamshoro Pakistan, MUET, Pakistan, Jamshoro Pakistan, presented at 2nd International Conference on Sustainable Development in Civil Engineering (ICSDC 2019), Jamshoro Pakistan, 05 December 2019 - 07 December 2019, https://www.researchgate.net/profile/Fahim_Ullah3/publication/337773028_After_the_Flood_A_Novel_Application_of_Image_Processing_and_Machine_Learning_for_Post-Flood_Disaster_Management/links/5de98833a6fdcc28370938f4/After-the-Flood-A-Novel-Application-of-Image-Processing-and-Machine-Learning-for-Post-Flood-Disaster-Management.pdf
2019
Hammad A; Ramanayaka C, 2018, 'EDUCATING BUILDING PROFESSIONALS FOR THE FUTURE IN THE GLOBALISED WORLD', in Hammad A (ed.), Curtin University, Singapore, presented at AUBEA, Singapore, 26 September 2018, https://www.icontract.ai/uploads/1/0/6/1/106114857/barriers_and_drivers_of_intelligent_contract_implementation_in_construction_-_alan_mcnamara.pdf
2018
Hammad A, 2018, 'Exploring the potential for achieving the triple bottom-line of sustainability through offsite manufacturing', in SUSTAINABILITY, Singapore, presented at AUBEA, Singapore, 26 September 2018, https://www.researchgate.net/profile/Olatunji_Abisuga/publication/329644625_A_framework_for_modelling_FM_organizational_response_to_users'_post-occupancy_feedback/links/5c13927ca6fdcc494ff38723/A-framework-for-modelling-FM-organizational-response-to-users-post-occupancy-feedback.pdf#page=49
2018
Hammad AWA; Wu P; Hammad M; Haddad A; Wang X, 2018, 'Mathematical optimisation of rail station location and route design in urban regions through minimising noise pollution', in ISARC 2018 - 35th International Symposium on Automation and Robotics in Construction and International AEC/FM Hackathon: The Future of Building Things, International Association for Automation and Robotics in Construction (IAARC), Berlin, Germany, pp. 1199 - 1204, presented at 35th International Symposium on Automation and Robotics in Construction (ISARC 2018) and the International AEC/FM Hackathon, Berlin, Germany, 20 July 2018 - 25 July 2018, http://dx.doi.org/10.22260/ISARC2018/0166
2018
Abidoye R, 2018, 'The application of advanced property valuation methods in practice: Evidence from Hong Kong and Nigeria', in Do K; Sutrisna M; Hammad A; Ramanayaka C (eds.), 42nd AUBEA Conference 2018: Educating Building Professionals for the Future in the Globalised World, AUBEA, Singapore, pp. 151 - 158, presented at 42nd AUBEA Conference 2018, Singapore, 26 September 2018 - 28 September 2018, https://docs.wixstatic.com/ugd/94be57_a1986413edcf4b18aec5aab332b8883b.pdf
2018
Fragoso R; Hammad A; Haddad A; Jonescu E; Do K, 2018, 'Comparative economic-environmental feasibility of reinforced concrete and laminated steel structures', Singapore, presented at AUBEA, Singapore, 26 September 2018, https://www.researchgate.net/profile/Emil_Jonescu/publication/328224758_Comparative_Economic-Environmental_Feasibility_of_Reinforced_Concrete_and_Laminated_Steel_Structures/links/5bcae96d299bf17a1c61ff8c/Comparative-Economic-Environmental-Feasibility-of-Reinforced-Concrete-and-Laminated-Steel-Structures.pdf
2018
Hammad A, 2018, 'Design Economics Through Use of BIM as a Decision Support System', in 42nd AUBEA: Australasian Universities Building Education Association Conference At: Singapore, Singapore, presented at AUBEA, Singapore, 26 September 2018, https://www.researchgate.net/publication/328224442_Design_Economics_through_use_of_BIM_as_a_Decision_Support_System
2018
Hammad A; Akbarnezhad A; Rey D; Grzybowska H, 2017, 'Decision Support System for Modular Construction Scheduling', in Proceedings of the 34th International Symposium on Automation and Robotics in Construction (ISARC), Taipei, Taiwan., pp. 302 - 307, presented at 34th International Symposium on Automation and Robotics in Construction, Taipei, Taiwan., 28 June 2017 - 01 July 2017
2017
Hammad AW; Akbar nezhad A, 2017, 'Modular vs Conventional Construction: A Multi-Criteria Framework Approach', in 2017 Proceedings of the 34rd ISARC, Taipei, Taiwan, Taipei, Taiwan, pp. 214 - 220, presented at 2017 Proceedings of the 34rd ISARC, Taipei, Taiwan, 28 June 2017 - 01 July 2017, http://dx.doi.org/10.22260/ISARC2017/0029
2017
Nadoushani ZSM; Hammad AW; Akbarnezhad A, 2016, 'A framework for optimizing lap splice positions within concrete elements to minimize cutting waste of steel bars', in ISARC 2016 - 33rd International Symposium on Automation and Robotics in Construction, Auburn University, Alabama, USA, pp. 444 - 451, presented at 33 rd International Symposium on Automation and Robotics in Construction (ISARC 2016), Auburn University, Alabama, USA, 18 July 2016 - 21 July 2016
2016
Hammad AWA; Akbarnezhad A; Rey D, 2016, 'A multi-objective mixed integer programming model for minimising obtrusive effects and installation costs of night-time lighting on construction sites', in ISARC 2016 - 33rd International Symposium on Automation and Robotics in Construction, pp. 505 - 514, http://dx.doi.org/10.22260/isarc2016/0061
2016
Hammad AW; Rey ; Akbar nezhad , 2016, 'A Bi-level Mixed Integer Programming Model to Solve the Multi-Servicing Facility Location Problem, Minimising Negative Impacts Due to an Existing Semi-Obnoxious Facility', in Sarker R; Abbass HA; Dunstall S; Kilby P; Davis R; Young L (eds.), Lecture Notes in Management and Industrial Engineering book series, SPRINGER INTERNATIONAL PUBLISHING AG, Canberra, Australia, pp. 381 - 395, presented at Data and Decision Sciences in Action pp 381-395, Canberra, Australia, 16 November 2016 - 18 August 2017, http://dx.doi.org/10.1007/978-3-319-55914-8_28
2016
Hammad AWA; Akbarnezhad A; Rey D, 2015, 'A comparison of mixed integer programming models for the construction site layout problem', in 32nd International Symposium on Automation and Robotics in Construction and Mining: Connected to the Future, Proceedings
2015
Hammad AWA; Akbarnezhad A; Rey D, 2015, 'A comparison of mixed integer programming models for the construction site layout problem', in 32nd International Symposium on Automation and Robotics in Construction and Mining: Connected to the Future, Proceedings, http://dx.doi.org/10.22260/isarc2015/0109
2015
Hammad A; Akbar Nezhad A; Rey D, 2015, 'A Comparison Of Mixed Integer Programming Models For The Construction Site Layout Problem', in 32nd International Symposium on Automation and Robotics in Construction and Mining: Connected to the Future, Proceedings, Oulu, Finland, presented at The 32st International Symposium on Automation and Robotics in Construction and Mining (ISARC 2015), Oulu, Finland, 15 June 2015 - 18 June 2015, http://www.iaarc.org/publications/fulltext/FFACE-ISARC15-3067544.pdf
2015
Hammad AW; Rey D; Akbar Nezhad A; Shen X, 2015, 'Dynamic Site Layout Planning through use of Unmanned Aerial Vehicles', in Dynamic Site Layout Planning through use of Unmanned Aerial Vehicles, The 9th International Symposium on Mobile Mapping Technology (MMT 2015), Sydney, Australia, presented at The 9th International Symposium on Mobile Mapping Technology (MMT 2015), Sydney, Australia, 09 December 2015 - 11 December 2015
2015
Hammad AWA; Rey D; Akbar Nezhad A, 2014, 'A mixed-integer nonlinear programming model for minimising construction site noise levels through site layout optimisation', in Akbarnezhad A; Shen X; Ha Q (eds.), 31st International Symposium on Automation and Robotics in Construction and Mining, ISARC 2014; Aerial Function Centre, the University of Technology, Sydney (UTS)Sydney; Australia; 9 July 2014 through 11 July 2014; Code 108796, IAARC, Sydney, pp. 722 - 729, presented at 31st International Symposium on Automation and Robotics in Construction and Mining, ISARC 2014 - Proceedings, Sydney, 09 July 2014 - 11 July 2014, http://www.iaarc.org/publications/fulltext/isarc2014_submission_230.pdf
2014
Conference Posters
add
Hammad AW, 2015, 'Solving the Site Layout Planning Problem Accounting for Obstacles', Sydney, presented at 37th Australasian Transport Research Forum (ATRF 2015), Sydney, 29 September 2015 - 01 October 2015
2015
Hammad AW; akbar nezhad A; Rey D; Waller , 2015, 'Solving the Site Layout Planning Problem Accounting for Obstacles', Sydney, presented at 37th Australasian Transport Research Forum (ATRF 2015), Sydney, 29 September 2015 - 01 October 2015
2015
Conference Presentations
add
Hammad AW; Akbar Nezhad ; Rey D; Waller , 2015, 'Site Layout Planning in the Presence of Travel Barriers using Mixed-Integer Programming', presented at EURO2015, Glasgow, 12 July 2015 - 15 July 2015
2015
Other
add
Hammad AW; Akbar nezhad ; Rey D; Waller , 2015, Solving the Site Layout Planning Problem Accounting for Obstacles
2015

Teaching Awards

  • Faculty Teaching Excellence Award - 2020
  • School Teaching Innovation Award - 2017
  • Exact Optimisation Methods including Mixed Integer Linear and Nonlinear Programming (MILP, MINLP);
  • Operational Research
  • Construction Law
  • Sustainable Design and Planning
  • Construction Economics
  • Building Information Modelling (BIM)
  • Digital Engineering
  • Data Science and Machine Learning
  • Noise Pollution

Teaching Expertise

I teach the following subjects:

  • BLDG1011 - Low rise Construction
  • BLDG1012 - Construction Materials
  • BLDG2012 - Construction and Property Law
  • BLDG3013 - Digital Construction (BIM)

Previous subjects that I have taught at UNSW and other universities:

  • Operational Research for Engineers
  • Construction Economics
  • Risk Management
  • Infrastructure Planning 
  • Specialised Construction
  • Prefabrication